Perched GWPT scheme

Perched GWPT scheme

SAWR were commissioned to provide groundwater treatment equipment and expertise at a large container port extension scheme in the south-east of the UK...
Read more

Domestic Oil Tank Failure

Domestic Oil Tank Failure

SAWR were called in by a major UK Insurer to assess an oil spill which had occurred in a sensitive area close to the upper reaches of a major river...
Read more

Chlorinated Solvent in Groundwater In-Situ Remediation 

HRC injection rig

At a former laundry site in East Anglia it was necessary to undertake the installation of approximately 200 doses of chemical to treat a chlorinated solvent in the groundwater. At the site there is a major potable water abstraction within 500m of the contamination. This means that it was not acceptable to leave the chlorinated solvents in the groundwater.